Welch Allyn PROPAQ CS Manual de servicio Pagina 88

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 142
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 87
84 Repair procedures Welch Allyn Propaq CS Vital Signs Monitor
6. Lift out the Recharger Board.
When installing the Recharger Board:
blow out any dust and particulates using pressurized de-ionized gas
move all cables out of the way
torque screws to 3.8 in-lb to 4.2 in-lb (0.43 N-m to 0.47 N-m)
Caution As you set the Recharger Board in place during installation, keep the
Board away from the power switch solder terminals to avoid binding against
them. The terminals may become damaged if force is applied against them.
0696 40
Screws
Screws
Vista de pagina 87
1 2 ... 83 84 85 86 87 88 89 90 91 92 93 ... 141 142

Comentarios a estos manuales

Sin comentarios